Park / Crimson Moon
- 
					 01-April 13 01-April 13
- Views 2,185
- Downloads 560
- Fans 1
- Comments 6
 
											
											
									
- 
				
				
				
					 56.15%(required: 65%) 56.15%(required: 65%) Design Submission Design Submission    Goliath123 75% 5dave 65% Kumba 65% Louis! 65% geewhzz 60% Roomie 60% Casimir 55% posix 55% Airtime 50% Jonny93 50% Loopy 50% pierrot 50% RMM 50% Wanted 25% 56.15% 
- 
			1 fan Fans of this park Fans of this park
- 
				
					 Download Park
					560 Download Park
					560
- 
			
				 Tags Tags

![park_4093 [H2H8 R2] Forgotten Mekong](https://www.nedesigns.com/uploads/parks/4093/aerialt3831.png)


![park_3128 [MM2014 R1] Earl Grey](https://www.nedesigns.com/uploads/parks/3128/aerialt2770.png)

I really liked the cobra roll support! But I could've hit you for not completing that water ride. I hate half-finished rides.
I'm not sure whether this is honest or sarcastic because it was unfinished like Casimir pointed out. Thanks anyway Louis!
I did send a message in the prep page, but I guess it was too late. The cobra roll support was influenced by something I saw on here a few months ago. I would have loved to finish the log flume, if I had had more room. It looked boxy when I had it finished in the space I had.
Behind by one now. Its not really a big deal whether I win or not anymore though. I'm continuing to do it because it's fun.
Thanks for the comments. I'd like to hear some things I could improve on as well.